Cedar Hot Tub Cabana: Arnprior

The client had the project engineered and the permit filed. Empire was hired since we were the lowest price bidder and quoted the job 33% cheaper then highest price bidder. We came in and made minor design changes in collaboration with the client and are very proud of the final product.

We set footings and laid down weed-guard and gravel under both structures.

The framing went up quick, but we made suggestions with respect to the pitch of the roof as well as the finishes on the ends of the rafters to give it more of an architectural look.

A clear corrugated PVC sheet was used as the roofing.

A Trex decking was installed with aluminum railing on the main deck leading out of the house.